Company News

Current location: home page > News > Company News

How to prepare the emergency plan for the oil and gas recovery device? Handling of abnormal operating conditions and arrangement of drills

Release date: 2026-10-10

View count:

The oil and gas recovery device operates quietly in the station most of the time, but abnormal conditions will not give notice: sudden increase in emission concentration, frequent alarms from the device, power outages, leaks, thunderstorms, each of which can disrupt smooth operation. How to handle abnormalities does not rely on the quick wit of on-site personnel, but on the pre-prepared emergency plan - who cuts off the power, who closes the valve, who reports, the procedures are written on paper in advance, and the on-site personnel follow them. Whether the emergency plan is well prepared or not, it is not obvious in ordinary times, but it becomes clear at the moment of abnormality. This article clarifies the key points of preparing the emergency plan, the abnormality handling process, and the arrangement of drills.

What should the plan be about

The plan is organized by scenarios, avoiding being comprehensive and extensive: excessive emissions, equipment malfunction and shutdown, power and water outages, oil and gas leaks, and extreme weather conditions such as thunderstorms. Each of the five scenarios is compiled into a one-page response card. Each card lists four items: the basis for judgment, the action to be taken, the reporting path, and the conditions for recovery. The basis for judgment provides specific data ranges: how much pressure difference is considered abnormal, and what concentration threshold triggers a shutdown. The numbers should be clearly stated, without vague phrases such as "prompt response". The action to be taken outlines the sequence: first control the source, then ensure safety, and finally restore operation. Getting the sequence wrong can escalate a minor incident into a major one. The plan should be written in the language of station employees. Copying pre-written templates that employees cannot memorize or apply is ineffective.

How to handle exceptions

How to prepare the emergency plan for the oil and gas recovery device? Handling of abnormal operating conditions and arrangement of drills

The core of handling lies in classification: operational-level anomalies - pressure difference drift, parameter overruns, where the on-duty personnel adjust according to the handling card and record the case; device-level anomalies - interlock shutdown, equipment failure, where the operation and maintenance personnel are notified to arrive on site, the device is switched to bypass during the shutdown period for observation, and the exceeding period is actively recorded and reported according to regulatory requirements; safety-level anomalies - leakage, fire hazards, where the hard procedures of shutdown, power cut-off, and evacuation are immediately implemented. The purpose of classification is authorization: what level of anomalies can be decided by the on-duty personnel, and what level must wait for instructions. If the plan is not clearly written, it is likely to be chaotic when executed.

How to arrange the drill

Drills should be conducted at least once every six months: scenarios are drawn from the disposal card, first rehearsed on the table and then practiced on site, with all staff taking turns. The drills focus on three aspects - response time, sequence of actions, and whether the reporting is in place. After the drill, a review is conducted, and any issues with the plan are corrected on the spot. New employees must go through the disposal card before starting work, and during seasonal changes, drills for scenarios related to thunderstorm and frost prevention should be prioritized. Drill records should be archived, as they are a must-see item during regulatory inspections. More importantly, only through drills can the plan be ingrained in the minds of employees; a plan on paper is not a plan.

There is another reminder for the preparation: the actual configuration of the plan and the device should match the table - where the bypass valve is, who to call for emergency, and which valves remain in place after power failure. The preparer should check the device diagram with the site one by one, and the plan copied from the template may not be able to locate the valve at the critical moment.

Reference for elements of the contingency plan

elementCompilation criteriaCheck the landing point
Scene classificationOne card for each page, covering five types of scenariosCovering device operating conditions
basis for judgmentThe data range should be clearly statedNo empty talk
Handling actionFirst control the source, then ensure safety, and finally restoreThe order is fixed
Reporting pathHierarchical authorization to individualsTelephone and responsible person
Recovery conditionsThe parameter returns to the intervalRecord archiving
Drill reviewHalf-yearly full-staff rotation performanceImmediate revision of the plan

Management checklist

  1. The five types of scenario handling cards are posted at the operation stations, with controlled versions;
  2. Based on the given data range, the judgment criteria are fixed, and the order of handling is predetermined;
  3. The reporting path and the contact number of the responsible person should be checked and updated quarterly;
  4. The drill is conducted every six months, alternating between theoretical knowledge and practical operation;
  5. New employees must pass the disposal card assessment before taking up their positions;
  6. The drill records and revised versions should be archived together for future reference.

Frequently Asked Questions

Should the plan be filed for record?

Implement according to local regulatory requirements. Most contingency plans involving safety and environmental incidents need to be filed; the filed version should be consistent with the on-site version, and be updated synchronously after revision to avoid having two different versions.

What about emissions during the shutdown of the device?

Follow the contingency plan, observe and continuously record through the bypass, and proactively report according to regulatory standards during periods of exceeding standards; expedite emergency repairs during downtime, and only resume operation once the recovery conditions are met, rather than forcing operation with defects.

What should we do about the situation where the drill is just a formality?

The drill includes a blind exercise segment - without prior notification of the scenario and time, timing is based on actual responses; the results of the drill are linked to team assessments, and any identified issues are rectified within a specified timeframe, thus reducing the likelihood of going through the motions.

This article is compiled by Luoyang Wohong Petrochemical Equipment Co., Ltd., which provides design, manufacturing, and operation and maintenance services for condensation recovery, membrane separation recovery, and complete solvent recovery equipment to chemical and pharmaceutical enterprises. If you need process evaluation or scheme configuration, please feel free to contact us for discussion.

Share to

National service network

NATIONAL SERVICE NETWORK 31 provinces, municipalities and autonomous regions · nearby service
  • Company Name:

    Luoyang Wohong Petrochemical Equipment Co., Ltd

  • Hotline:

    13526990215

  • Company Address:

    W2-1, Dongda Technology Industrial Park, Luoxin Industrial Cluster, Xin'an County, Luoyang City

  • E-mail

    lixiang@vohonoilpipe.com

Scan to follow us

Luoyang Wohong Petrochemical Equipment Co., Ltd Powered by EyouCms  Henan ICP Registration No. 17014668-11  sitemap.xml

TEL:13526990215